Project Title    Parameter Adjustment for the Droop Control Operating a Discharge PEC in PMG-Based WECSs With Generator-Charged Battery Units. Objective: Main objective of this project aims to enhance the ability of the PMG-based WECS and its battery storage system to meet their command power delivery, while ensuring the frequency and voltage stability at the PCC.